Institutional Strengthening for the Phase-out of Ozone Depleting Substances (Phase-VI)

Main objective of the Renewal of Institutional Strengthening for the Phase-out of Ozone Depleting Substances (Phase-VI) project is to follow up the activities of the Ozone Cell as constituted within the Department of Environment under Phase-I to function as the focal point for coordination of all activities related to the implementation of the phase-out action plans specified in the Country Programme

July/11 - June/14


(Ongoing)

130,000.00

105.00 lac


MLF/UNDP

    • Inventory update

    • Preparation of HPMP stage-I

    • Awareness activities

    • International Ozone Day

    • Assist Implementation of other ODS project

Conversion from HCFC-141b to Cyclopentane technology in the manufacture of insulation foam in domestic refrigerators at Walton Hi-Tech Industries Ltd, Bangladesh

The objective of this project is to phase out the use of HCFC-141b in the manufacture of insulation foam for domestic refrigerators in Walton Hi-Tech Industries Limited, Bangladesh. This will result in phasing-out 183.7 MT of HCFC-141b in Bangladesh as per 2009 survey report

July/11 - June/14


(Ongoing)

1146,000.00

262.05 lac


MLF/UNDP

    • CFC-11 and CFC-12 phase-out in the manufacturing of Metered Dose Inhalers by Square, Acme & Beximco Pharmaceuticals

Phase-out of CFC consumption in the Manufacture of Metered Dose Inhalers (MDIs) in Bangladesh

Main objective of this project is phase-out the consumption of 76.3 ODP Tonnes of CFC-11 and CFC-12 used in the manufacture of Metered Dose Inhalers (MDIs) in Bangladesh by 2013.

July/08 - June/14


(Ongoing)

2780,000.00

250.06 Lac

MLF/UNDP

    • Phase-out HCFC-141b in the manufacturing of body foam in Refrigerator manufacturing industry.