Institutional Strengthening for the Phase-out of ODS (Phase-I)

The main objective of the project (Phase-I) is to setup Ozone Cell in the Department of Environment to function as the focal point for coordination of all activities related to the implementation of the phase-out action plans specified in the country programme for implementation for Montreal Protocol

Mar/96 - Feb/99


(Completed)

150,000.00

69.00 lac


MLF/UNDP

    • Ozone Cell Constituted

    • Inventory update

    • Dissemination of information to the stakeholder

    • Preparation of aerosol sector project (ACI Conversion Project)

Conversion to CFC-Free-Technology in the Manufacture of Aerosol Products at ACI Ltd

This project will phase-out the use of 520.0 tons of CFC 11/CFC 12 annually in aerosol production by converting to hydrocarbons as aerosol propellant a commercially viable and environmentally acceptable technology.

Sep/98 - Feb/2000


(Completed)

56,836,900.00

261.45 lac

MLF/UNDP

    • First private public partnership project implemented

    • Assist ACI Ltd. through technical & financial support

    • Phased-out 50% CFC consumption.

Institutional Strengthening for the Phase-out of ODS (Phase-II)

The main objective of the project (Phase-II) is to follow up the activities of the Ozone Cell as constituted within the Department of Environment to function as the focal point for coordination of all activities related to the implementation of the phase-out action plans specified in the country programme.

Mar/99- June/02


(Completed)

100,000.00

54.85 lac

MLF/UNDP

    • Assist implementation of Aerosol sector project

    • Preparation of Refrigeration Management Plan (RMP)

    • Awareness raised

Implementation of a National Programme for Recovery and Recycling of Refrigerants.

The main objective of the project is to implement a comprehensive national programme for recovery and recycling of refrigerants in the refrigeration and air-conditioning sectors.30 metric tones of CFC-12 will recovered from Refrigerator Air conditioner and will be recycling for reuse.

Jan/01-Jun/05


(Completed)

298,270.00

172.64 lac

MLF/UNDP

    • Capacity building of RAC service sector

    • Provide recovery & cycling machine to RAC sector

    • Recovered CFCs from refrigerator

Implementation of the Refrigerant Management Plan : Monitoring of the Activities Included in the Refrigerant Management Plan (RMP)

The main objective of the project is to carry out the monitoring activities listed in the Refrigerant Management Plan (RMP). The project will monitor the activities indicated in the RMP and ensure that CFC-12 is recovered and recycled according to the Recovery and Recycling Project. After completion of the project it is expected that 11.6 ODP Tonnes of CFC-12 will be phased out per year.

Jan/01- Dec/04


(Completed)

1,545.50

8.95 lac

MLF/UNDP

  • Assist Government to phase-out 50% ODS as per Montreal Protocol obligation.

Training Programme on Good Practices in Refrigeration

The main objective of the training project is to reduce CFC emission and consumption in the refrigeration sector by improving the servicing procedures of the refrigeration and air-conditioning equipment. Under Phase-I, a group of selected local trainers and senior technicians will be trained by an international consultant and under Phase-II, technicians engaged in the refrigeration servicing sector will be trained by local trainers already trained under Phase I of the project.

Dec/02 - Dec/04


(Completed)

68,000.00

39.44 lac

MLF/UNEP

    • Capacity building of RAC service technician.

    • Trained 1000 RAC technician on good service practices


Implementation of the RMP: Training programme for Customs Officers

The main objective of the training programme is to provide the customs officers and relevant stakeholders with the skills necessary to monitor and control the imports and exports of Ozone Depleting Substances (ODS), including equipment containing ODSs as well as detecting and preventing illegal trade of ODS.

Dec/02 - June/04


(Completed)

7,500.00

4.35 lac

MLF/UNEP

    • Capacity building of Customs Officers for combating illegal trade of ODS during transition.

    • ODS identifier provided to the custom entry point.

Institutional Strengthening for the Phase-out of ODS (Phase-III)

The main objective of the 'Institutional Strengthening for the Phase-out of ODS (Phase-III)' project is to follow up the activities of the Ozone Cell as constituted within the Department of Environment under Phase-I to function as the focal point for coordination of all activities related to the implementation of the phase-out action plans specified in the country programme.

April/02-Mar/05


(Completed)

100,000.00

58.46 lac

MLF/UNDP

    • Inventory update

    • Preparation of National ODS Phase-out Plan for 100% CFC phase-out

    • Awareness activities


National ODS Phase-out Plan - UNEP

Components

The main objective of the project is to provide support in implementation of NOPP for elimination of ODS consumption in Bangladesh in order to meet its Montreal Protocol Obligations.

July/04 - June/11


(Completed)

90,500.00

226.05 lac

UNEP/UNDP

    • Training of 2500 RAC technicians

    • Training of 200 custom officers

    • Awareness raising in RAC sector

Institutional Strengthening for the Phase-out of ODS (Phase-IV)

Main objective of the Institutional Strengthening for the Phase-out of Ozone Depleting Substances (Phase-IV) project is to follow up the activities of the Ozone Cell as constituted within the Department of Environment under Phase-I to function as the focal point for coordination of all activities related to the implementation of the phase-out action plans specified in the Country Programme.

July/05-June/08


(Completed)

130,000.00

89.11 lac

MLF/UNDP

    • Inventory update

    • Preparation of conversion project for Pharmaceutical sector for phase-out of CFCs in MDI production

    • Assist implementation of ODS project.

National ODS Phase-out Plan - UNDP

Components

Main objective of the project is to provide support in implementation of NOPP for eliminations of ODS consumption in Bangladesh in order to meet its Montreal Protocol Obligations.

July/05 - June/12


(Completed)


1025,000.00

615.00 lac

MLF/UNDP

    • Capacity building of RAC sector through providing retrofit training for CFC based refrigerator

    • Provide equipment to RAC sector

Institutional Strengthening for the Phase-out of ODS (Phase-V)

Main objective of the Institutional Strengthening for the Phase-out of Ozone Depleting Substances (Phase-V) project is to follow up of the activities of the Ozone Cell as constituted within the Department of Environment under Phase-I to function as the focal point for coordination of all activities related to the implementation of the phase-out action plans specified in the Country Programme.

July/08 - June/11


(Completed)

130,000.00

89.05 lac

MLF/UNDP

    • Inventory update

    • Preparation of HPMP stage-I

    • Awareness activities

Transitional Strategy for the Phase-out Use of CFC in the manufacturing of Metered Dose Inhalers in Bangladesh

Main objective of the project is to assist the Government to phase-out CFCs in the manufacturing of MDIs to ensure compliance with Montreal Protocol commitments.

July/08 - June/10


(Completed)

70,000.00

47.60 lac

MLF/UNEP

    • Capacity building of health sector through providing training